Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Assembly
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 07661B-14/1 APPENDIX A c. Assembly. (1) Clean gas tubes (16) thoroughly, making sure holes in tubes are open.  Assemble sleeve (18) on gas tube and secure in dimension shown, figure 3-7, with hose clamp (19).  Install tank bushing (17) on threaded end of gas tube. Tighten securely.  Do this for both gas tubes. (2) Insert gas tube assemblies into inlet ports of dry chemical tank.  Tighten tank bushings securely. (3) Install elbows (15) and inlet tubes (14) into tank bushings. (4) If piping was disassembled beyond extent indicated in b above, subassemble piping before installation, per arrangement shown in figure 3-7. NOTE Before  connecting  pipe  fittings,  apply  four  wraps  of  teflon  tape  (MIL-T-27730A)  one  to  two threads  from  end  of  any  male  pipe  fitting.    Apply  two  to  three  drops  of  Loctite  342  at  the leading edge of the tape.  Surface of tape must be clean and free from dirt, grease or oil before applying Loctite. (5) Connect  piping  subassembly  to  tank  by  turning  short  pipe  (13)  into  vent  port  on  top  of  tank.    Tighten securely. (6) Connect discharge piping assembly by turning short pipe (12) into tank discharge port. (7) Connect hose (10) to bottom of swivel adapter (23). (8) Couple the assembled piping to the inlet tubes at unions (9). (9) Connect hose (21) to swivel adapter (22). d. Installation. (1) Using suitable equipment, lift tank and attached piping into position on skid frame.  Secure tank to frame with stainless steel bolts, flat washers, lock washers, and nuts previously removed. (2) Connect hose reel inlet hose (3) to nipple (4).  Seal all pipe fittings using instructions in NOTE, paragraph 3-14c. (3) Attach high pressure hose (1) to regulator tee subassembly. (4) Connect valve rod (5) to dry chemical valve (7) with nut (6). (5) Install Dry Chemical nitrogen cylinder.  Refer to paragraph 2-10c. (6) Pressurize system and check for leaks.  Use a soap solution of dishwashing detergent and water. NOTE Slow bubble leakage only permitted through pipe joint compound in packings and gasketed joints.  No leakage permitted in taper threaded joints. 6. Service tank and nitrogen cylinder as required to return system to ready status, paragraph 3-10. A 3-23

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business