Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Fuel Transfers - Cont'd
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

4-16  Fuel Transfers - Cont'd. 1. Connect the supply tanker-truck (or trucks) to the couplings outboard of VI TJ (or V2TJ, V3TJ, V4TJ). 2. Open V5TJ (or V6TJ), V7TJ, V8TJ, V 1OTJ and V13TJ. 3. Start pump P1 TJ and open V9TJ.  Pressurize and feed the switching manifold. 4. When the transfer is complete, shut down the pump PITJ and close all valves opened above.  Disconnect the tanker-truck(s). WARNING TANKER TRUCK MOVEMENT Do not allow truck to move away without disconnecting the hoseline.  A spill could result. d. Transfer Fuel from Switching Manifold to Secondary Module Tanks Fuel is transferred from the switching manifold to secondary module tanks as follows: 1. Reset meter MS1J to zero or record the reading. 2. Open valves in the hoseline route to tank. a) ToT1J.  OpenV1J,V2J,V3J,V4J andV5J. b) To T2J.  Open V1J, V2J, V3J, V4J and V8J. c) To T3J.  Open V1J, V2J, V19J, V20J and V21J. d) To T4J.  Open v1j, V2J,V19J, V2OJ and V24J. 3. Transfers may be made to two to four tanks simultaneously if desired, however, the quantity to a specific tank will not be recorded by meter. 4. If transferring to more than one tank, the flow to each tank will not necessarily be equal.  Close the valves to a particular tank when the tank top touches the range pole cord. 5. If transferring to a single tank and a continuing transfer to another  tank  is  desired,  first  open  the  valves  in  the route to the next tank and then close the valve in the route to the full tank.  Record the meter reading at the time of shift and this can be used to determine the quantity transferred to the first tank. 6. When the transfer is complete to all tanks, close valve V1J and record the meter reading. 7. Close all valves opened in the transfer process. 4-35

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business