3-19.2
Installation.- Cont'd . Refer to figure 2-61A.
h.
Install coupling adapters (5) on ends of suction hoses (10).
i.
Connect suction hoses (6) between coupling adapters (5) and gate valves on Y assembly (8).
j.
Connect suction hoses (6) between Y assembly (8) and suction side of fuel pump (7).
k.
Connect discharge hose (2) between discharge side of fuel pump (7) and inlet of Y assembly (8).
i.
Connect discharge hoses (2) to gate valve of Y assembly (8). (Hoses connect to transfer hose line set.) m.
Connect discharge hoses between Y assembly (8), and tee (9).
n.
Inspect all connections to verify correct installation of flanges, coupling clamps, coupling gaskets, and security of
cam-lock devices.
3-20 Assemble and Install Switching Manifold .
One (1) system per TPT.
3-20.1
Assembly. No assembly of the switching manifold is required prior to installation.
3-20.2
Installation. Refer to figure 2-62.
CAUTION
INTERNAL CLEANLINESS
Make sure all hoselines, fittings and valves are clean internally. Foreign materials may disrupt
operations and damage equipment.
a.
Position crates containing 6-inch aluminum tees, 6-inch aluminum gate valves, 6inch sampling assembly and 6-
inch aluminum pipeline set near their respective installation sites as indicated.
b.
Remove tees, valves, pipeline, sampling assembly, coupling clamps, and coupling gaskets from crate.
c.
Inspect all items for damage, cleanliness, and quantities required.
d.
Connect 6-inch tees (1) together to form the configuration shown.
e.
Connect gate valve assemblies (2) to tees (1).
f.
Connect aluminum pipe (4) between gate valves (2).
g.
Connect aluminum pipeline kit between tee (1) and sampling assembly (3).
3-15
|