| |
TM 10-8110-203-12&P
CHAPTER 4
UNIT MAINTENANCE PROCEDURES
Section I. REPAIR PARTS AND SPECIAL TOOLS LIST
4-1. COMMON TOOLS AND EQUIPMENT.
For authorized common tools and equipment refer to the Modified Table of Organization and Equipment (MTOE)
applicable to your unit.
4-2. SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT.
Refer to the Maintenance Allocation Chart contained in Appendix B for maintenance tasks authorized at unit level and for
the TMDE and support equipment required to perform these tasks.
4-3. REPAIR PARTS.
Repair parts are listed and illustrated in Appendix C - Repair Parts and Special Tools List (RPSTL).
Section II. SERVICE UPON RECEIPT
4-4. SERVICE UPON RECEIPT.
WARNING
Lifting or moving heavy equipment incorrectly can cause serious injury. Do not try to lift or move
more than 50 pounds by yourself. Get an assistant. Bend legs while lifting. Do not support
weight with your back.
a. Remove drum from container. Refer to Figure 4-1.
b. Position drum so end plates are accessible.
WARNING
Do not use excessive pressure when applying sealant onto nipple threads. Sharp thread edges
can cause serious injury.
c. Apply sealant provided with drum to threads on pipe nipple (1) and install into adapter (2).
d. Install adapter and nipple into closure plate (3).
CAUTION
Hand-tighten adapter and nipple into closure plate. Over-tightening could strip threads.
4-1
|