Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: UNIT TROUBLESHOOTING PROCEDURES CONT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-5430-242-12&P 0008 00 Change 1 0008 00-8 TROUBLESHOOTING PROCEDURE BERM LINER DRAIN FITTING ASSEMBLY SYMPTOM Drain fitting assembly leaks between drain fitting and berm liner. MALFUNCTION Check for missing or loose washers and hex head cap screws. CORRECTIVE ACTION Replace missing screws or washers.  Torque the fastening hardware to 15 or 16 ft-lb (20.34 or 21.70 N m).  See WP 0033 00 for GTA Models, check the gaskets between the male disconnect coupling and the berm liner for nicks, breaks, and tears.  See WP 0032 00 for Reliance Models, check the preformed packing between the drain cover plate and the tank fitting for nicks, breaks, and compression.  For MPC Models, check the 90º elbow fitting for nicks, breaks, and compression. CORRECTIVE ACTION Replace the gaskets or o-ring. See WP 0032 00 (Reliance Model) or WP 0033 00 (GTA Model). Replace the 90º elbow, gaskets, or o-ring. See WP 0033 01 (MPC Model). TROUBLESHOOTING PROCEDURE BERM LINER DRAIN HOSE ASSEMBLY SYMPTOM Drain hose assembly does not drain properly. MALFUNCTION Check for dirt, grime, cracks or wear. CORRECTIVE ACTION Service the drain hose. See WP 0031 00. END OF WORK PACKAGE

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business