Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: UNIT TROUBLESHOOTING PROCEDURES CONT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-5430-242-12&P 0008 00 0008 00-7 Change 1 CORRECTIVE ACTION Replace the fastening hardware as required.  Torque fastening hardware to 15 or 16 ft-lb (20.34 or 21.70 N m).  See WP 0027 00 (GTA Model) or WP 0028 00 (Reliance and MPC Models). SYMPTOM Filler/discharge assembly elbows leak. MALFUNCTION Check elbows for cracks, dents, or wear. Check for damaged or missing elbow gaskets. CORRECTIVE ACTION Replace damaged elbows and gaskets.  See WP 0027 00 (GTA Model) or WP 0028 00 (Reliance and MPC Models). TROUBLESHOOTING PROCEDURE TANK DRAIN FITTING ASSEMBLY SYMPTOM Drain fitting assembly leaks between drain fitting and tank. MALFUNCTION Check for missing or loose washers and hex head cap screws. CORRECTIVE ACTION Replace missing screws or washers.  Torque the fastening hardware to 15 or 16 ft-lb (20.34 or 21.70 N m).  See WP 0029 00. Check the preformed packing between the drain cover plate and the tank fitting for nicks, breaks, and compression. CORRECTIVE ACTION Replace the preformed packing. See WP 0029 00. SYMPTOM Drain fitting leaks through metal. MALFUNCTION Check the drain cover plate for damage or cracks. CORRECTIVE ACTION Replace the drain cover plate. See WP 0029 00.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business