(Steps m o for 50K Tank only) 4th Fold: Fold tank over again, approximately 5 feet, 1 inch
(1.549 m).
m. 5th Fold: Fold tank over again, approximately 5 feet, 2 inches (1.575 m).
n. 6th Fold: Fold the tank over again, such that the vent fitting is located in the center of the fold.
Fold will measure approximately 5 feet, 6 inches (1.676 m). Adjust the folded package so that
folds line up and package is stacked straight and upright, not twisting.
o. (Steps p r for 10K, 20K and 50K Tanks only) Go to the lower edge of tank.
p. 1st Fold: Starting at the lower edge of the tank, fold up to the fitting chafing patch, approximately
3 feet, 10 inches (1.168 m).