Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INITIAL ADJUSTMENTS AND ROUTINE CHECKS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-5430-242-12&P 0005 00 0005 00-13 Change 1 INITIAL ADJUSTMENTS AND ROUTINE CHECKS NOTE If the tank is cut or punctured during any phase of operation, refer to WP 0006 00 for emergency repair procedures. 1.    Position filled sandbag (1) under hose (2) near filler/discharge elbow (3). This support will reduce stress on the tank fitting, the gasket in the hose coupling, and the coupling of filler/discharge elbow (3). WARNING Check the placement of sandbags to see potential leak points in order to avoid fire hazard.  Not checking the positions of sandbags can cause serious injury or death by fire or explosion. 2.   Position other sandbags (1) or wood blocks on the ground near the hose connections so that a faulty or leaking connection is easier to see, and a fire hazard can be avoided. 3.   Inspect the tank to verify the elevated connection setup for easy leak detection. 4.   Check drain ball valve (4) to verify that it is in the closed position. 5.   Check the vent pipe assembly relief cap (5) to verify freedom of operation. 6.   Check the filler/discharge gate or ball valve (6) to verify closed position.                      Elevated Connections for Easy Leak Detection 6 1 1 3 4 2 5 2 6

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business