|
|
TM 10-5430-239-12&P
0020 00
ASSEMBLY
1. Place new gasket (14) in dust cap (15).
2. Place new gasket (4) in elbow (2).
3. Place suction stub (13) on flat hard surface with bolt holes on top.
4. Place one new flange gasket (12) on the suction stub (13) and align the bolt holes.
5. Place closure plate (7) on top of suction stub (13) and flange gasket (12) and align the bolt holes.
6. Place the other new flange gasket (12) on closure plate (7) and align holes.
7. Place flanged adapter (3) on flange gasket (12) and align holes. Place flat washers (11) over holes in
flanged adapter (3).
8. Insert screws (10) through holes in flanged adapter (3). Torque screws (10) to 10 ft-lbs. (14 Nm).
9. Lubricate new o-ring (9) with silicone compound and place in o-ring groove in tank fitting (8).
10. Place closure plate (7) and attached components on tank and insert suction stub (13) through
opening in tank until closure plate (7) contacts tank fitting (8).
11. If tank is lying completely flat, lift tank toward closure plate (7) to start screws (5) in tank fitting (8).
Loosely install twenty screws (5) and washers (6).
12. Torque screws (5) to 30 in-lb (3.41 Nm). For GTA-210KF model, torque screws (5) to 10 ft-lb
(13.5 Nm).
13. Place elbow (2) on flanged adapter (3). Pull inward on cam-lever arms (1) to lock items together.
END OF WORK PACKAGE
0020 00-3/4 blank
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |