|
|
TM 10-5430-239-12&P
0017 00
Table 1. Unit Preventive Maintenance Checks and Services
for Fuel Storage Tank (continued).
EQUIPMENT
ITEM
MAN-
ITEM TO BE CHECKED
INTERVAL
PROCEDURE
NOT READY/
NO.
HOUR
OR SERVICED
AVAILABLE IF:
Filler/Discharge
22
After
Check for evidence of
Evidence of
Assembly (6)
damage or leakage.
leakage. Cam-
Check if cam-lever arms
lever arms
are damaged or missing.
damaged or
Check if elbow body is
missing. Elbow
cracked or sealing surface
body cracked or
is badly dented. Check for
worn.
loose, damaged or missing
screws and gaskets.
23
Semi-
Drain Fitting
Check immediate area for
Evidence of
annually
Assembly (7)
evidence of leakage.
leakage. Drain
Check the drain plug, drain
plug, drain hose
hose or drain ball valve for
or drain valve
damaged or missing parts.
are missing,
improperly
connected or
damaged.
24
Semi-
Berm Liner Drain Fitting
Check immediate area for
Evidence of
annually
Assembly (8)
evidence of leakage.
leakage. Drain
Check drain plug, drain
plug, drain hose
hose or drain valve for
or drain ball
damaged or missing parts.
valve are
missing,
improperly
connected,
damaged or
leaks.
END OF WORK PACKAGE
0017 00-7/8 blank
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |