|
|
TM 10-5430-238-12&P
0017 00
ITEM TO BE
EQUIPMENT
MAN-
CHECKED OR
PROCEDURE
NOT READY/
ITEM
INTERVAL
HOUR
SERVICED
AVAILABLE IF:
NO.
17
During
Filler/Discharge
Check for evidence of damage or
Cam-lever arms
Assembly (8)
leakage. Check if cam-lever
are damaged or
arms are damaged or missing.
missing. Elbow
Check if the elbow body is
body is cracked.
cracked or sealing surface is
Elbow sealing
badly dented. Check for loose,
surface is badly
damaged or missing screws and
dented.
gaskets.
Check immediate area for any
Drain plug, drain
18
During
Drain Fitting
evidence of leakage. Check the
hose, drain valve
Assembly (9)
drain plug, drain hose, or drain
is missing, not
(Except Models
valve, for damaged or missing
properly
parts.
connected, or
BA91-141,
damaged.
BA91-140)
Drain Fitting
Assembly (10)
(Models BA91-
141 and BA91-
140)
19
After
Tank (1)
Inspect for tears, punctures, or
Tank has tears
leaks (Exclude weeping/wicking
or punctures that
where the tank seams are not
cannot be
involved and droplets do not
repaired.
form or run down the side of the
tank).
20
After
Filler/Discharge
Check for bent or binding stem,
Stem, hand-
Gate Valve (2)
broken hand-wheel, and
wheel, gasket, or
(Models
leakage.
cam-lever arms
WTM3KF,
are damaged or
missing.
M52983-50,
PD52983-50,
BA92-162,
FCE574-81-1-
A, SC5430-
97CLE01)
21
After
Filler/Discharge
Check for bent or binding stem,
Stem, handle,
Butterfly Valve
broken handle, and leakage.
gasket or cam-
Assembly (3)
lever arms are
(Models BA91-
damaged.
141 &
BA91-140)
22
After
Filler/Discharge
Check for bent or binding stem,
Stem or handle
Ball Valve (4)
broken handle, and leakage.
is damaged.
(Models BA91-
141A &
BA91-140A)
0017 00-7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |