Click here to make tpub.com your Home Page

Page Title: UNIT TROUBLESHOOTING PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-5430-238-12&P
OPERATOR AND UNIT MAINTENANCE MANUAL
(INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)
COLLAPSIBLE FABRIC TANKS, FUEL STORAGE, 3,000,
10,000, 20,000, AND 50,000 GALLON
UNIT TROUBLESHOOTING PROCEDURES
INTRODUCTION TO UNIT TROUBLESHOOTING
This Troubleshooting Malfunctions chapter lists common malfunctions that may be found during the
operation or maintenance of the collapsible fabric fuel tank assembly or its components. Perform the
tests/inspections and corrective actions in the order listed in the table.
This manual cannot list all malfunctions that may occur, nor all tests or inspections and corrective actions.
If a malfunction is not listed or is not corrected by listed corrective actions, notify supervision.
TROUBLESHOOTING PROCEDURE
HOSE ASSEMBLY, FILLER/DISCHARGE
SYMPTOM
Hose couplings leak.
MALFUNCTION
Check for tears and leaks in the hose.
CORRECTIVE ACTION
If hose is damaged, see WP 0022 00.
TROUBLESHOOTING PROCEDURE
DRAIN HOSE ASSEMBLY (Except Model MIL-T-52983B)
SYMPTOM
Drain hose assembly does not drain properly.
MALFUNCTION
.
Check for dirt, grime, cracks or wear.
CORRECTIVE ACTION
Service the drain hose. See WP 0025 00.
TROUBLESHOOTING PROCEDURE
FILLER/DISCHARGE GATE VALVE ASSEMBLY (Models MIL-T-52983B, WTM3KF, M52983-50,
PD52983-50, BA92-162, FCE574-81-1-A, SC5430-97CLE01)
SYMPTOM
Female coupling leaks.
0008 00-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business