| |
TM 10-5430-237-12&P
0018 00
0018 00-5/6 blank
Table 3. Curing Times for Fabric Repair
NOTE
These times are for a thickness of approximately 0.10 inches (0.25 cm);
they will be reduced for thicker sections and extended for thinner sections.
Temperature
Movement of Use In-
volving No Loading
Or Immersion
Full Mechanical Or
Thermal Loading
Immersion In
Chemicals
41
F (5
C)
6 hours
72 hours
120 hours (5 days)
50
F (10
C)
4 hours
48 hours
84 hours
59
F (15
C)
3 hours
48 hours
72 hours
68
F (20
C)
2 hours
24 hours
60 hours
77
F (25
C)
1.5 hours
24 hours
48 hours
86
F (30
C)
1 hour
24 hours
36 hours
END OF WORK PACKAGE
|