| |
TM 10-4930-248-13&P
Section
III.
UNIT TROUBLESHOOTING
PROCEDURES
4-5.
INTRODUCTION.
I
This section provides
troubleshooting
information
for the CCR Nozzle at the unit level of maintenance.
It
consists of the malfunction
index, table 4-1, listing the most common malfunctions,
and troubleshooting
table,
Table 4-2. The troubleshooting
table is presented
as flow diagrams
for each malfunction
listed in the
malfunction
index.
Each diagram
provides
the procedure
and corrective
actions to return
the CCR Nozzle to
operational
readiness.
4-6.
TROUBLESHOOTING.
The troubleshooting
table
lists the common
malfunctions
which
can occur in operation
of the CCR Nozzle.
The tests, inspections
and corrective
actions
should be performed
in the order given.
Table 4-1. Malfunction
index.
MALFUNCTION
PAGE
1.
Leakage
Between
Strainer
Body and Strainer
Housing
.
...........................
4-4
2.
Leakage
Between
Nozzle Inlet Coupling
and Hose Coupling
.......................
4-5
3.
Inadequate
Fuel Flow From CCR Nozzle
.........................................
4-6
4-3
|