Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-15. Open Port Nozzle Operation.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4930-247-13&P 2-12. OPERATING PROCEDURES - cont. e. Open Port Nozzle Operation.  Refer to figure 2-15.  The open port nozzle must be connected to the CCR nozzle prior  to  operation.    The  CCR  nozzle  reduces  system  fuel  pressure  to  the  open  port  nozzle  to  prevent  excessive fuel flow to the aircraft. (1) Remove dust cover (1) from end of discharge tube (2). (2) Place end of discharge tube (2) in fuel tank adapter (3). (3) Set CCR Nozzle (4) to OPEN.  Refer to TM  10-4930-248-13&P. (4) Squeeze control handle (5) to dispense fuel. (5) When fuel tank is full, release control handle (5). (6) Remove end of discharge tube (2) from fuel tank adapter (3). (7) Set CCR nozzle (4) to CLOSE.  Refer to TM  10-4930-248-13&P. (8) Install dust cover (1) on end of discharge tube (2). Figure  2-15.  Open Port Nozzle Operation. Change 6  2-37

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business