| |
TM 10-4930-247-13&P
2-12.
OPERATING PROCEDURES - cont.
e.
Open Port Nozzle Operation. Refer to figure 2-15. The open port nozzle must be connected to the CCR nozzle
prior to operation. The CCR nozzle reduces system fuel pressure to the open port nozzle to prevent excessive
fuel flow to the aircraft.
(1)
Remove dust cover (1) from end of discharge tube (2).
(2)
Place end of discharge tube (2) in fuel tank adapter (3).
(3)
Set CCR Nozzle (4) to OPEN. Refer to TM 10-4930-248-13&P.
(4)
Squeeze control handle (5) to dispense fuel.
(5)
When fuel tank is full, release control handle (5).
(6)
Remove end of discharge tube (2) from fuel tank adapter (3).
(7)
Set CCR nozzle (4) to CLOSE. Refer to TM 10-4930-248-13&P.
(8)
Install dust cover (1) on end of discharge tube (2).
Figure 2-15. Open Port Nozzle Operation.
Change 6 2-37
|