Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-14. Single Point Refueling Nozzle (D1) Operation.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4930-247-13&P 2-12.  OPERATING PROCEDURES - cont. (8) To take fuel sample, place end or tube (9) in sample container. (9) Slowly move control handle (1) on ball valve (2) to open position. (10) When sampling is complete, set control handle (1l on ball valve (2) to close position. Recirculation Nozzle Disconnection.  Refer to figure 2-14. (11) Set CCR Nozzle (8) to CLOSE.  Refer to TM10-4930-248-13&P. CAUTION If   control   lever   is   not   in   the   full   CLOSED   position   (against   mechanical   stop), internal fuel pressure may force the poppet into the OPEN position. (12) Rotate control lever (7) to full CLOSE position (against the internal mechanical stops). (13) Grasp handles (5) and  rotate  nozzle  body  (4)  to  the  left  until  nozzle  body  disconnects  from  tanker  adapter (6). (14) Install dust cover (3) on end of nozzle body (4). Figure 2-14.  Single Point Refueling Nozzle (D1) Operation. 2-36  Change 5

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business