Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Table 2-1. Operator Preventive Maintenance Checks and Services For Models HTARS100 and HTARS101 - cont.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4930-247-13&P Table 2-1.  Operator Preventive Maintenance Checks and Services for Models HTARS100 and HTARS101 - cont Item Location No. Interval Item Procedure Not Fully Mission Check/Service Capable If: 12 During CCR Nozzle Perform "DURING" PMCS in accordance with TM10-4930-248-13&P 13 During Open Port Inspect for leaks at fuel discharge tube, Any fuel leak. Nozzle nozzle body and coupling. 14 During Single Point a.  Inspect for leaks through end of nozzle Any fuel leak. Refueling Nozzle (discharge end). b.  Inspect nozzle body and coupling for Any fuel leak. leaks. c.  (Model HTARS101) Inspect for Any fuel leak. leakage at pressure regulator breather. 15 During Recirculation a.  Inspect for leaks through end of nozzle Any fuel leak. Nozzle (discharge end). b.  Inspect for leaks between inlet adapter Any fuel leak. and nozzle body. c.  Inspect ball valve for leaks. Any fuel leak. 16 (DELETED) 17 During Discharge Hose, Inspect hose material and valved dry break Any fuel leak. 2 in x 50 ft. couplings for leaks. 18 During Elbows Inspect elbow body and non-valved Any fuel leak. couplings for leaks. 19 During Tees Inspect tee body and valved couplings for Any fuel leak. leaks. 20 During Discharge Hose, Inspect hose material, valved dry break Any fuel leak. 3 in x 50 ft. coupling and ball valve assembly for leaks. 21 During Grounding Rods Check connection of grounding clamps. Grounding clamp (s) Clamps must be securely fastened. disconnected. Reconnect if required. 2-16  Change 4

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business