Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Table 2-1. Operator Preventive Maintenance Checks and Services (cont)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4930-246-13&P Location Item Interval Item  to Check/Service Procedure Not  Fully   Mission  Capable  If: No. 3 Before Inlet  Elbow   Assembly Check  elbow  for  cracks. Damaged  enough  to cause leaking or  interfere  with   operation. 4 Before Grounding   Cable Check  that grounding   cable, Grounding   cable,  bonding  plug, Assembly bonding  plug,  and grounding   clip and grounding   clip  are broken  or are in  place  and  in  good missing. condition. 5 Before Handles Check  that  handles  are in place Handles  missing  or damaged and in  good  condition. enough  to prevent  operation. j 4   GROUNDING    CABLE 3   INLET   ELBOW   ASSEMBLY,' LY 5   HANDLES 6 Before Nozzle  Body  Assembly Inspect  connection   end and  verify Index pins  or  collar  lock  pins that index  pins  are intact,   in missing,  worn  or  damaged. place, and not  excessively   wom or damaged. PROTECTIVE LEVER PLASTIC 0@ DUST   COVER COLLARR/ COLLAR   LOCK   PINS 7,(r 6   NOZZLE   BODY ASSEMBLY INDEX   PINS 2-7

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business