Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section IV. UNIT MAINTENANCE PROCEDURES
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4930-245-13&P Section IV. UNIT MAINTENANCE PROCEDURES 4-7. GENERAL. This section contains instructions for performing unit level maintenance on the CCR Nozzle. 4-8. PERSONNEL SAFETY. Personnel must remove all items of jewelry (rings, bracelets, watches, necklaces, etc.) and loose clothing before working on equipment.  Jewelry and loose fitting clothing can get caught in moving equipment and result in injury to personnel. When  performing  maintenance  of  the  CCR  Nozzle,  keep  in  mind  the  purpose  of  the  equipment  is  to  distribute  fuel. Cleaning fluids, lubricants, preservatives, paint or other chemicals must not be allowed to contaminate the fuel. Operate the equipment after performing maintenance to ensure repairs have been performed correctly and equipment can be returned to service. 4-9. PROPER EQUIPMENT. Obtain  proper  equipment  before  starting  maintenance.    This  includes  hand  tools  and/or  special  tools,  receptacles  for storing small parts and expendable materials required by the maintenance task. 4-7

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business