TM 10-4930-245-13&P
Section III. UNIT TROUBLESHOOTING PROCEDURES
4-5.
INTRODUCTION.
This section provides troubleshooting information for the CCR Nozzle at the unit level of maintenance. It consists of the
malfunction index, table 4-1, listing the most common malfunctions, and troubleshooting table, table 4-2. The
troubleshooting table is presented as flow diagrams for each malfunction listed in the malfunction index. Each diagram
provides the procedure and corrective actions to return the CCR Nozzle to operational readiness.
4-6.
TROUBLESHOOTING.
The troubleshooting table lists the common malfunctions which can occur in operation of the CCR Nozzle. The tests,
inspections and corrective actions should be performed in the order given.
Table 4-1. Malfunction Index.
MALFUNCTION
PAGE
1.
Leakage Between Strainer Body and Strainer Housing, . ...................................................................... 4-4
2.
Leakage Between Nozzle Inlet Coupling and Hose Coupling ................................................................ 4-5
3.
Inadequate Fuel Flow From CCR Nozzle.............................................................................................. 4-6
4-3
|