Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section II. SERVICE UPON RECEIPT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4930-241-13 Section II.  SERVICE UPON RECEIPT 4-4.  SITING. a. Transport.    The  AFSSP  is  designed  to  be  packaged  and  transported  by  truck  or  aircraft.    Secure  AFSSP components to the transport vehicle before movement. b. Site Selection.  When selecting a site for installation of the fuel system, consider the overall operating area. Siting must include access to the aircraft, tanker and rail staging areas and provide adequate space  to  set  up the system, and space for movement of support vehicles.  Site should be level, free of overhead obstructions and provide good drainage to prevent water damage.  Avoid low areas where fuel vapors  can  collect.    To prevent a hazard to personnel and equipment, site must be located downhill or downstream from other installations.  For additional siting information, refer to FM 10-68 and FM10-69. 4-5.  SHELTER REQUIREMENTS. The   fuel   system   does   not   require   special   sheltering   during   normal   operation.      Store   unused   fuel   system components in a storage van or shelter to prevent damage and minimize routine maintenance. 4-6.  CHECKING UNPACKED EQUIPMENT. a. Unpacking Fuel System Equipment.  Components of the AFSSP are packaged and shipped in cardboard boxes or crates.  Where possible, save packaging materials for reuse.  Use ca e when unpacking to prevent damage to fragile components.  This manual addresses installation and use of all components, but you may not need to unpack all of them to perform your mission. Refer to the applicable technical manuals for unpacking instructions for the following equipment: 600 GPM Pump Assembly  ....................................................................................... TM 10-4320-342-24 Closed Circuit Refueling (CCR) Nozzle and Gravity Fill Adapter ..................... TM 10-4930-243-13&P Single Point Refueling Nozzle (D1) .................................................................... TM 10-4930-242-13&P Collapsible Fabric Tank, Low Temperature  .............................................................. TM 10-543231-12 200 Gpm Filter-Separator  ........................................................................................ TM 10-4330-236-13 4-3

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business