Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INITIAL ADJUSTMENT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4930-240-13 2-16.  INITIAL ADJUSTMENT. a.  Hoses, Couplings and Valves. (1)  Verify that all quick disconnect coupling connections are secure. (2)  Verify that all valve sections are positioned with handwheels facing up and closed. (3)  Verify that caps and plugs are installed on all open components. (4)  Inspect fuel hoses for kinks, twists and tight bends.  Straighten hoses as required. b.    500  Gallon  Collapsible  Drums.    Perform  initial  adjustments  m  accordance  with  TM  10-8110-203- 12&P. c.  200 GPM Pump.  Perform initial adjustments in accordance with TM 10-4320-342-10. d.  Filter Separator.  Perform initial adjustments in accordance with TM 10-4330-23613. e.   CCR Nozzle and Gravity Fill Adapter.  Perform initial adjustments in accordance with TM 10-4930- 243-13&P. f.   Single Point Refueling Nozzle (D1).  Perform initial adjustment in accordance with TM 10-4930-242- 13&P. g.  Fire  Extinguishers.  Position fire extinguishers. 2-17.  OPERATING PROCEDURES. a   General.  The AFARE has two primary modes of operation, refueling and defueling.  In the refueling mode,  fuel  is  removed  from  the  500  gallon  collapsible  drums  and  distributed  to  the  refueling  points (nozzles).    In  the  defuel  mode,  fuel  is  removed  from  the  aircraft  and  stored  in  the  500  gallon collapsible drums. b  500 Gallon Collapsible Drum Operation.  For procedures required to operate the 500 gallon collapsible drums, refer to TM 10-8110-203-12&P. c.  200 GPM Pump Operation.  For procedures required to operate the 200 GPM pump, refer to TM 10- 4320-342-10. d  200 GPM Filter Separator Operation.  For procedures required to operate the 20OGPM filter separator, refer to TM 10-4330-236-13. e   Single  Point  Refueling  Nozzle  (D1)  Operation.    For  procedures  required  to  operate  the  single  point refueling nozzle and gravity fill adapter, refer to TM 10-4930-242-13&P. f  CCR Nozzle and Gravity Fill Adapter.  For procedures required to operate the CCR nozzle and gravity fill adapter, refer to TM 10-4930-243-13&P. 2-51