Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: FRAME ASSEMBLY.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM   10-4930-238-12&P 4-19.  FRAME  ASSEMBLY. This task consists of: a.   Removal b.   Repair c.   Installation INITIAL  SETUP: Tools  Required: Tool Kit, General Mechanic’s, Appendix B , Item 3 Equipment   Conditions: Forward Area Refueling Equipment shutdown per para. 2-6 b. Ge neral Safety Instructions: Do not smoke or use an open flame in vicinity of the Forward Area Refueling Equipment. Failure to comply may result in personnel injury. a. Removal.  (Refer  to  Figure  4-17.) (1) Remove discharge hose from frame (1). (2) Remove contents from container (2). Figure   4-17.   Frame   Assembly,   Removal/Installation. 4–27

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business