| |
TM 10-4930-238-12&P
4-12. GROUND ROD.
This task consists of:
a. Removal
b. Installation
INITIAL SETUP:
Equipment Conditions:
Forward Area Refueling Equipment shutdown per para. 2-8 b.
a. Removal. (Refer to Figure 4-5.)
(1)
Unbuckle two straps (1) and open flap (2).
(2)
Remove two ground rods (3) from container (4).
b.
Installation.
(1)
Insert two ground rods (3) into container (4).
(2)
Close flap (2) and buckle two straps (1).
Figure 4-5. Ground Rod, Removal/lnstallation.
411
|