Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-8. FARE Schematic for Two-Point Refueling Operation
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM  10-4930-238-12&P 2-9. PREPARATION FOR MOVEMENT - Continued a.  Teardown of Two-Point Refueling  Operation. (Refer to Figure 2-8).) (1) Disconnect closed circuit nozzle ground cable (1) from helicopter. (2) Disconnect ground cable (2) from ground rod. Pull ground rod (3) from the ground and stow in  suction  hose  assembly  storage  container. Figure   2-8.   FARE   Schematic   for   Two-Point   Refueling   Operation. NOTE Place nozzle end of closed circuit nozzle in a suitable container and drain fuel from system. Remove each hose assembly and individual fittings one at a time. Drain fuel from each hose assembly and fittings into a suitable con- tainer, before placing them into their storage containers. (3) (4) (5) (6) (7) (8) (9) Remove closed circuit nozzles (4), install dust cap and stow in container located on dis- charge hose assembly frame. Remove discharge hose assemblies (5). Install dust cap and stow hose assembly on frame. Remove wye fitting (6), install dust caps and dust plug. Stow wye fitting in container located on discharge hose assembly frame. Remove suction hose assemblies (7). Install dust caps and stow hose assemblies in the suc- tion hose container. Remove water detector adapter (8) and stow in container located on “y” discharge hose as- sembly frame. Remove elbow coupler valve (9), adapter (10), butterfly valve (11), and tee fitting (12). Install dust caps and plugs. Stow all parts in container located on discharge hose container. Disconnect ground cables (13 and 14) and stow with the pumping assembly and filter/sepa- rator. Change  1 2-15/(2-16   blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business