Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Siting.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

2-10 TM   10-4930-238-12&P Three  persons  are  required   in lifting hose and component kits, which weighs 145 Ibs (64.83 kgs). Three-persons are required in lifting filter separator, which, weighs 125 Ibs (56.25 kgs). Four persons are required in lifting pump assembly which weighs 196 Ibs (88.98 kgs). Failure to comply with this warning could result in inju- ry to personnel. a.  Siting. (1)  Select  a  site  that  will  provide  a  relatively  level  terrain. (2) Clear away brush, leaves and dry grass from the area where the pump assembly will be operated. b. Installation for Two-Point Refueling Operation. (Refer to Figure  2-4.) (1) (2) (3) NOTE Prior  to  starting  installation  procedures,  remove  suction  hose  assemblies  and ground rods from canvas container. Remove discharge hose and fittings from frame and canvas container. Position pumping assembly (6) in its desired location. NOTE Remove dust plugs and dust caps before installing individual components. Position filter separator (7) in its desired location. NOTE Secure individual components with their camlock levers. Connect elbow coupler valve (1) to drum assemblies. Figure  2-4.  FARE  Schematic  for  Two-Point  Refueling  Operation.

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business