Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Hose Assembly, Suction.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4930-229-12&P 4-11. Hose Assembly, Suction. This task covers: a. Repair b.  Test c.  Replace INITIAL SETUP Tools: Banding Tool, Item 2, Section III, Appendix B Tool  Kit,  General  Mechanic's,  Item  1,  Section  III, Appendix  B Multimeter, Digital, Item 3, Section III, Appendix B Materials/Parts: Seals, 1/2 In., Item 1, Appendix E Strapping, 1/2 In., Item 2, Appendix E Equipment  Condition: FARE shutdown per para. 2-12. General  Safety  Instructions: WARNING l Do not smoke or use an open flame in the vicinity of the FARE, failure to comply may result in personnel injury. l Drain any fuel into suitable container. Clean up any fuel spills to prevent fire or environmental hazard. a. Repair  (figure  4-1) (1) Couplings. To replace a defective coupling, proceed as follows: (a) (b) (c) (d) (e) (f) (g) Cut band and remove damaged coupling (1). Ensure static wire extends beyond end of hose (2) a minimum of 1/4 in. Install barbed end of new coupling in hose end. Ensure static wire is in contact with coupling. Slide buckle (3) on banding material (4), bend approximately 1 in. of banding material under buckle. Wrap  banding  material  around  hose  twice  running  end  through  each  time. Place band in open slot of banding tool nose (5) and in slide. With thumb on band gripper lever (6), apply tension by turning handle (7) of tool clockwise. After tension is created, it is no longer necessary to hold band gripper lever as it locks itself under tension. Place finger on banding material (4) at buckle bridge while tensioning with tool handle (7) in a clockwise  direction. When banding material stops moving through buckle (3) as handle (7) turns, stop turning. Maximum tension is exerted by banding material around hose. WARNING Failure to back off with tension handle throughout entire course of roll may result in breaking of band, and injury to personnel. 4-11

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business