TM 10-4320-351-14
6.4.26 Install Starter.
Refer to paragraph 4.14.1.
6.4.27 Install Gates, Shroud and Oil Cooler. (Refer to figure 6-50.)
This task consists of:
a. Installation
INITIAL SET-UP:
Tools:
Materials/Parts Required:
Wrench, combination, 6 mm
Engine Lubricating Oil, 2 quarts
(Appendix B, Section III, Item 3)
(Appendix F, Section II, Item 23)
Wrench, combination, 1/4 in.
Washer (Appendix I, Item 32)
(Appendix B, Section III, Item 3)
Washer (Appendix I, Item 71)
Socket, socket wrench, 5 mm
Washer (Appendix I, Item 72)
(Appendix B, Section III, Item 3)
Washer, Lock (Appendix I, Item 70)
Key, socket head wrench, 5 mm
(Appendix B, Section III, Item 3)
Screwdriver, cross tip, #2
(Appendix B, Section III, Item 3)
Combination wrench, 19 mm
(Appendix B, Section III, Item 3)
Combination wrench, 13 mm
(Appendix B, Section III, Item 3)
Socket, socket wrench, deep well, 5 mm
(Appendix B, Section III, Item 3)
Socket, socket wrench, deep well, 13 mm
(Appendix B, Section III, Item 3)
Extension, Socket Wrench, 3/8 in. drive, 3 in.
(Appendix B, Section III, Item 3)
Wrench, ratchet, 114 in. drive
(Appendix B, Section III, Item 3)
Wrench, ratchet 3/8 in. drive
(Appendix B, Section III, Item 3)
General Safety Requirements:
Equipment Condition:
Oil pan and oil filter installed (para. 6.4.25)
Starter installed (para. 6.4.26)
a.
From fuel injector side of engine, insert tie rod (1) between cylinders, hooking tie rod to the two inboard cylinder
head studs.
b.
Install nut (2) and washer (3) attaching gate (4) to tie rod.
NOTE
Fuel supply line from fuel feed pump to injection pumps, fuel return line and fuel
solenoid wires will have to be fed through gate (7). They may have been
connected in a previous procedure. Disconnect and reconnect after installing gate
(7).
6-79
|