Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Assembly of Pumping Assembly
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4320-348-14 WARNING The  pump  unit  must  be  connected  to  a  suitable  ground  before  operation.    Arcing  caused  by buildup of static electricity may ignite volatile fluids and cause explosion and fire. CAUTION Maintain clearance under the pump unit.  Intake cooling air entering the underside of the pumping unit can be blocked, causing damage to the unit. NOTE The  pump  unit  is  designed  to  be  versatile  and  fulfill  many  potential  tasks  during  the  transfer  of flammable  liquids.    Therefore  the  following  set  up  is  a  typical  set  up  for  transfer  of  flammable liquid  from  a  55-gallon  drum  to  a  nozzle  assembly  at  the  dispensing  point.    The  proper  pump accessories are provided with the pump unit to allow many other potential applications.  For any application, the basic setup remains the same for the pump assembly.  The only differences would be the pumping assembly accessories selected for use and connecting to the pumping assembly. b. Assembly of Pumping Assembly.  (Refer to Figure 2-4.) (1) The pump unit should be positioned on a level surface near the source of fuel being pumped. (2) Drive  ground  rod  (1)  into  earth.    Secure  one  end  of  grounding  cable  (2)  to  pump  ground  connection  (3). Secure other end of grounding cable to ground rod (1).  Make sure grounding cable makes metal-to- metal contact with pump frame and rod. (3) Remove  dust  plug  (4)  from  suction  (intake)  female  cam-lock  coupling  (5).    Remove  dust  cap  (6)  from suction hose assembly (7).  Connect male end of suction hose assembly (7) to suction (intake) female cam- lock coupling (5). (4) Remove  dust  plug  (6)  from  suction  hose  assembly  and  remove  dust  cap  (9)  from  coupler  and  drum unloader  90  degree  elbow  (10).    Connect  female  end  of  suction  hose  assembly  (7)  to  drum  unloader  90 degree elbow (10) or make connections to other pump accessories as required by desired application. (5) Remove dust cap (11) from pump discharge male cam-lock coupling (12).  Close the pump drain valve (13), then prime the pump assembly by pouring approximately two gallons of the liquid to be pumped through the pump discharge male cam-lock coupling (12). (6) Remove  dust  plug  (14)  from  discharge  hose  assembly  (15),  and  connect  female  end  of  discharge  hose assembly (15) to pump discharge male cam-lock coupling (12). NOTE As fluid fills the volute, air is removed through the discharge port. (7) Remove  dust  cap  (16)  from  discharge  hose  assembly  adapter  and  remove  plug  (17)  from  the  nozzle assembly coupler (18).  Connect male end of discharge hose assembly (15) to nozzle assembly coupler (18) or make connections to other pump accessories as required by desired application. 2-18

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business