| |
TM 10-4320-348-14
SECTION III. OPERATION UNDER USUAL CONDITIONS
2.5 ASSEMBLY AND PREPARATION FOR USE. This paragraph shows how to assemble the pumping assembly and
prepare it for use. The steps provided and the illustrations shown are for a typical pump set up. Always be sure that you
follow your local standard operating procedures (SOP) first if there is a conflict between the steps shown here and your
SOP. (Refer to Figure 2-3.)
a.
Opening Storage Chests. (Refer to Figure 2-3.)
(1)
Carefully squeeze ratchet release (1) and end of strap ratchet handle (2) together until tension on strap (3)
is released.
(2)
Rotate strap ratchet handle (2) upward to fully release ratchet assembly (4) locking device.
(3)
While keeping strap ratchet handle (2) in the upward position, pull entire ratchet assembly (4) away from
storage chest (5) to totally disengage strap (3) from slot (6) of ratchet assembly.
(4)
Remove strap (3) from top of storage chest (5).
(5)
Release four rubber latch handles (7) from catches (8) and remove storage chest lid (9) from storage chest
(5).
Figure 2-3. Opening Storage Chests.
2-17
|