TM 10-4320-343-14
SECTION III. OPERATION UNDER USUAL CONDITIONS
2.3 ASSEMBLY AND PREPARATION FOR USE.
Upon reaching the operating area where pumping assembly is to be used, prepare the
equipment for use as follows:
a.
Prepare a level site.
b.
Be sure all sides
accessible.
c.
When connected to
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
Position the
suction lift
of the equipment and all fittings and controls are easily
towing vehicle, perform following:
equipment as close as possible to the fuel source.
Keep
as low as possible.
Remove pins (figure 2-3, 1 and 2) and extend trailer support legs (3) as
far as possible.
Reinstall pins (1 and 2) to secure trailer support legs (3).
Release pintle (4) and disconnect pumping assembly from towing
vehicle (5).
Secure wheels (6) and remove ground rod (7).
Drive ground rod (7) into ground.
Connect ground cable (8) between ground rod (7) and ground studs (9) .
Refer to data plate and ensure two fuel selector valves (10) are
positioned as follows:
Fuel tank as source to TANK
Auxilary supply as source to FUEL AUX
Remove quick release pins (11 and 12) from trailer tongue and slide
tongue shaft (13) inward to non-extended position and align holes.
Insert quick release pins (11 and 12) and secure tongue in non-extended
position.
2-11
|