| |
TM 10-4320-343-14
Table 2-2 Operator Preventive Maintenance Checks and Services for the 350 GPM Pumping Assembly. (continued)
Location
Not Fully
Item
Item to
Mission
No.
Interval
Check/Service
Procedure
Capable if:
14
Before
AXLE AND FRAME
Visually inspect for broken
ASSEMBLY
welds, torsion spring, bent or
otherwise damaged axle.
Inspect for broken welds,
reflectors, damaged landing leg
assemblies and damaged towbar.
15
Before
GROUND ROD
Check that ground rod is
Ground not
properly installed and cable is
connected.
attached to frame.
AIR CLEANER
ASSEMBLY
16
During
AIR CLEANER
Check service indicator for red
Service
ASSEMBLY
signal indicating that air
indicator
cleaner requires servicing.
cannot be
reset.
EXHAUST SYSTEM
17
During
EXHAUST SYSTEM
Visually inspect spark arrestor,
exhaust pipe and muffler for
obvious damage. Listen for
excessive noise.
FUEL SYSTEM
18
During
FUEL LINES
Visually inspect fuel lines and
Fuel leaks at
connections for leaks.
any level or
fuel lines
damaged.
19
During
CONTROL PANEL
Inspect for damage, secure
Proper
mounting and proper operation of
indications
controls and instruments.
are not
maintained.
PUMPING ASSEMBLY
Any class
20
During
CENTRIFUGAL PUMP
Check for signs of leakage,
leak, unusual
unusual noise, or vibration.
noise, or
vibration.
FUEL TANK
21
During
FUEL TANK
Check fuel tank gauge. When
low, service tank
(paragraph 3.7)
22
After
WIRING HARNESS
Inspect for frayed or worn spots
Wiring are
in wiring harness.
damaged or
broken.
23
After
FUEL FILTER/
Drain water into suitable
SEPARATOR
container.
2-10
|