Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: CONTROL BOX ASSEMBLY REMOVAL AND INSTALLATION.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4320-342-24 2-65.  CONTROL BOX ASSEMBLY REMOVAL AND INSTALLATION. This task covers: a.  Removal b.  Installation INITIAL SETUP Tools Equipment Condition General Mechanics Tool Kit (App B, Sect III, Battery disconnected (Para 2-62) Item 1) 200/600 GPM pump assembly removed from system (Para 2-9, TM 10-4320-342-10) a.  REMOVAL.  Refer to Figure 2-92. (1) Open cover (1) and lock in place. (2) Open control panel (2). (3) Remove connectors (3, 4, 5 and 6) from receptacle connectors (7, 8, 9 and 10). (4) Remove hose assemblies (11 and 12) from straight adapters (13 and 14). (5) Remove bolt (15), flatwashers (16) and control box assembly (17). b.  INSTALLATION. (1) Install control box assembly (17) and secure with bolts (15) and flatwashers (16). (2) Install hose assemblies (11 and 12) onto straight adapters (13 and 14). (3) Install connectors (3, 4, 5 and 6) onto the receptacle connectors (7, 8, 9 and 10). (4) Close control panel (2) and lower cover (1). 2-218

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business