Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-51. Priming Shut Off Valve (Ball Valve) Replacement
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4320-342-24 2-31.  PRIMING SHUT OFF VALVE (BALL VALVE) REPLACEMENT - continued. (2) Install elbow (3) on adapter (15) as noted during removal. (3) Install adapter (14) in valve (12). (4) Install union (13) on adapter (14). (5) Install elbow (9) in union (13) as noted during removal. (6) Position clamp (7) on valve (12). (7) Position assembled components on panel and install flatwasher (11) and nut (10). (8) Install bolt (6), flatwashers (5) and nut (4). (9) Connect tubes (2 and 8) onto elbows (3 and 9). (10)  Install panel (1). Figure 2-51.  Priming Shut Off Valve (Ball Valve) Replacement 2-132

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business