Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4320-342-24 2-25.  FEMALE FLANGE ADAPTER REPLACEMENT - continued. (5) Remove split rings (14) and chain (15) from dust plug (16) and female flange adapter (4). (6) Remove dust plug (16) and gasket (17) from female flange adapter (4). b. INSTALLATION. (1) Install gasket (17) and dust plug (16) in female flange adapter (4). (2) Connect split rings (14) to chain (15), dust plug (16) and female flange adapter (4). NOTE Elbow  (11)  and  adapter  (12)  are  used  only  on  the  200  GPM  pump.    These  are replaced with a swivel elbow on the 600 GPM pump. (3) Lubricate and install preformed packing (13), adapter (12) and elbow (11) in female flange adapter (4). NOTE A swivel elbow is used only on the 600 GPM pump. (4) Lubricate and install preformed packing (10), adapter (9) and swivel elbow (8) in female flange adapter (4). (5) Position screen (6) into female flange adapter (4). (6) Lubricate and install new packing (7) on female flange adapter (4). (7) Position  female  flange  adapter  (4)  on  pump  and  clutch  assembly  (5)  and  install  bolts  (3),  flatwashers  (2)  and locknuts (1).  Torque 297 to 327 foot-pounds. 2-119