2-9. PREPARATION FOR MOVEMENT - continued.
(15) Wheels positioning (wheels down). Refer to Figure 2-12.
WARNING
When raising the 200/600 GPM Pump, turn the jack screw crank handles evenly
or the pump could tip over and cause injury to personnel or equipment damage.
(a)
Install two screw jacks (1) on winch end of 200/600 GPM Pump (2) and install detent pins (3).
(b)
Using two people, crank two screw jacks (1) at same time until the 200/600 GPM Pump (2) is approximately
12 inches (30.48 cm) off the ground.
(c)
Remove detent pins (4) from wheels (5) and rotate wheels (5) to down position and install detent pins (5).
(d)
Lower 200/600 GPM Pump (2) until wheels (5) are on the ground.
(e)
Remove two detent pins (3) and remove two screw jacks (1).
(f)
To lower other wheels repeat steps (1) thru (5).
Figure 2-12. Wheel Positioning (Wheels Down)
2-49
|