| |
TM 10-4320-342-10
2-6. ASSEMBLY AND PREPARATION FOR USE - continued.
(6)
Control panel. Refer to Figure 2-7.
(a)
On control panel (1) release two turn-lock fasteners (2) and lift up.
(b)
Rotate door latch (3) and position it on mounting lug (4).
WARNING
Make sure ground rod is installed. Failure to observe this warning may result in
injury to personnel or death.
(7)
Install ground rod. Refer to applicable system TM.
(8)
Install 200/600 GPM fuel pump suction and discharge hose. Refer to applicable system TM.
(9)
External fuel supply. Refer to applicable system TM.
(10) Place suitable container under drain and remove drain cap (5).
Figure 2-7. 200/600 GPM Pump Preparation for Use
2-40
|