| |
TM10-4320-324-14
5-25. Coupling Flange Replacement.
This task covers:
a.
Removal
c.
Installation
b.
Cleaning/lnspection
d.
Follow-on Maintenance
INITIAL SETUP:
Tools
Equipment Condition
Tool kit, general mechanics, item 35, section III,
Pump assembly removed (para 5-23).
appendix B
Materials/Parts
Lockwashers (6) - 21171-511
a.
Removal. Remove six screws (1), six lockwashers (2), and coupling flange (3).
b.
Cleaning/Inspection. Inspect for obvious damage and excessive wear. Replace defective coupling flange.
c.
Installation. Install coupling flange (3), six lockwashers (2), and six screws (1).
d.
Follow-on Maintenance. Install pump assembly (5-23).
END OF TASK
5-92
|