| |
TM 10-4320-324-14
c.
Assembly.
(1) Apply adhesive to new gasket (5).
(2) Position gasket (5) on cylinder head (6).
(3) Install cover (4) and aline holes.
(4) Thread screw (1), with flat washers (2 and 3)
installed, into cylinder head (6) and tighten.
d.
Follow-on Maintenance. Install belt and pulley
guard (para 4-31).
END OF TASK
4-151
|