| |
TM 10-4320-324-14
f.
Follow-on Maintenance.
(1)
Install bottom panel (para 4-22).
(2)
Install lower rear panel (para 4-21).
(3)
Install right hand side panels (para 4-20).
(4)
Install left hand side panels (para 4-19).
(5)
Install front panel (para 4-18).
(6)
Install control box panels (para 4-16).
END OF TASK
4-85
|