TM 10-3835-231-13
(i) Completion of Commissioning.
1
Make sure all valves in the system are closed to avoid operating error.
2
Take a sample of all tank drains for accumulation of water and contaminant (BS&W). Draw off any
accumulation prior to routine operation.
3
Perform all "After" PMCS.
4
Transfer fuels as necessary when directed by operating management.
5
Record fuel inventory.
u. Fuel Transfers. (See figure 2-25.) Alternate fuel transfers may be conducted by changing the hoseline
configuration with prior approval of the operating authority. Only one fuel unit section is shown. These instructions would
apply to as many fuel units as are applicable.
WARNING
OVERFILLING FABRIC TANKS
Do not overfill the fabric collapsible tanks. A spill through the vent or possibly a
rupture and major spill could result.
(1) Check that commissioning procedures have been completed.
CAUTION
To avoid damage to equipment:
·
Feed rates to the fuel unit should not exceed 800 GPM.
·
Pressure at switching manifold (entry pressure) should not exceed 150 psig.
·
Pump discharge pressure should not exceed 75 psig.
NOTE
This procedure assumes that fuel is flowing from the associated pipeline to one of
the fuel units.
(2) Divert off specification fuel to the contaminated fuel module as follows:
(a) Prior to the arrival of the interface, open valves (1) and (2).
(b) When the sample results indicate the interface has arrived, promptly open valve (3).
(c) Close any open valves (4) at the switching manifold.
2-59
|