Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: OPERATING PROCEDURES. - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-3835-231-13 (i) Completion of Commissioning. 1 Make sure all valves in the system are closed to avoid operating error. 2 Take  a  sample  of  all  tank  drains  for  accumulation  of  water  and  contaminant  (BS&W).    Draw  off  any accumulation prior to routine operation. 3 Perform all "After" PMCS. 4 Transfer fuels as necessary when directed by operating management. 5 Record fuel inventory. u.    Fuel  Transfers.    (See  figure  2-25.)  Alternate  fuel  transfers  may  be  conducted  by  changing  the  hoseline configuration with prior approval of the operating authority.  Only one fuel unit section is shown.  These instructions would apply to as many fuel units as are applicable. WARNING OVERFILLING FABRIC TANKS Do  not  overfill  the  fabric  collapsible  tanks.    A  spill  through  the  vent  or  possibly  a rupture and major spill could result. (1) Check that commissioning procedures have been completed. CAUTION To avoid damage to equipment: · Feed rates to the fuel unit should not exceed 800 GPM. · Pressure at switching manifold (entry pressure) should not exceed 150 psig. · Pump discharge pressure should not exceed 75 psig. NOTE This procedure assumes that fuel is flowing from the associated pipeline to one of the fuel units. (2)  Divert off specification fuel to the contaminated fuel module as follows: (a) Prior to the arrival of the interface, open valves (1) and (2). (b) When the sample results indicate the interface has arrived, promptly open valve (3). (c) Close any open valves (4) at the switching manifold. 2-59

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business