| |
TM 10-3835-231-13
5-7. METER SKID ASSEMBLY REPAIR.
This task covers:
a. Disassembly
b. Repair
c. Assembly
INITIAL SETUP
Tools
Equipment Condition
Tool Kit, General Mechanics (Appendix B, Section III,
Meter skid assembly removed. (See para 4-36.)
Item 1).
Material/Parts
Antisieze Tape (Appendix E, Item 6).
Lock washers (3 each) (Appendix I, Item 6).
Petrolatum (Appendix E, Item 5).
NOTE
Disassemble only to the extent necessary for repair.
a.
Disassembly.
(1)
Remove plastic caps (1).
(2)
Remove four screws (2), separate meter (3) body halves and remove tachometer flow meter (4).
(3)
Remove three each caps screws (5), lock washers (6), and flat washers (7). Discard lock washers.
(4)
Release coupling (8) handle and remove meter (3) and coupling.
(5)
Release quick disconnect coupling (9) cam arms and remove hose assembly (10).
(6)
Remove quick disconnect coupling (9), ball valve (11), pipe nipple (12), and street elbow (13).
(7)
Remove hose clamp (14) and hose (15).
(8)
Remove combination nipple (16), pipe nipple (17) and street elbow (18).
5-8
|