| |
I n t e r v al
Item
No.
9
TM 10-3835-219-14
Table 2-1. Preventive Maintenance Checks and Services (PMCS) (cont).
B - Before Operation
D - During Operation
A - After Operation
B
D
A
Item to be inspected
Procedure
Pullboard Assembly
a.
b.
c.
Inspect pullboard (21) for breaks or
cracks. Replace pullboard if damage
is found.
Inspect eye bolt (22) and nut (23) for,
security, damaged threads, cracks or
distortion. If loose, damaged or
distorted, notify next higher level of
maintenance.
Inspect braces (24), nuts (25), and
bolts (26) for cracks, breaks and
security. If defects are noted, notify
higher level of maintenance.
Equipment is not
ready/available if:
Pullboard is cracked or
broken.
Eyebolt is cracked, distorted,
damaged, or missing.
Braces are cracked or broken,
or hardware is loosen.
2-9
|