Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Table 2-2. Operators Preventive Maintenance Checks and Services
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM   5-4320-304-14 TM   08922A-14/1 Equipment  operation  is  allowable  with  minor  leakages  (Class I or II). Of course, you must consider the fluid capacity in the item/system being checked/inspected. When in doubt, notify  your  supervisor. When operating with Class I or Class II leaks, continue to check fluid levels as required in your PMCS. Class III leaks should be reported to your supervisor or organizational  maintenance. Table 2-2. Operator’s Preventive Maintenance Checks and Services NOTE If the equipment must be kept in continuous operation, check and service only those items that can be checked and serviced without disturbing operation. Make the complete checks and services when the equipment can be shut down. Perform weekly as well as before operation PMCS if: Item No. 1 (1) You are the assigned operator and have not operated the item since the last weekly. (2) YOu  are  operating  the  item  for  the  first  time. Within  designated  interval,  these  checks  are  to  be  performed in the order listed. B  -  Before  Operation A   –   After   Operation M   –   Monthly D  –  During  Operation W – Weekly B Interval D A W M l ITEM  TO  BE  INSPECTED Equipment is Not  Ready/ PROCEDURE Available If: Frame Assembly and Warning Plates. Check  attaching  hardware  used  to  mount  components of  centrifugal  pump  unit.  Attaching  hardware  shall be  tight  and  free  of  corrosion  and  damage.  Compo- nents  of  pump  attached  directly  to  frame  (1)  are: Warning plates (2) Engine brackets (3) Identification   plate   (4) Cracks are de- tected,  or  engine is loose. 2-5

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business