| |
TM 9-2330-398-24
Section II. MAINTENANCE ALLOCATION CHART
FOR SEMITRAILER, TANK: 5000 GALLON, M969A2 (continued)
(1)
(2)
(3)
(4)
(5)
(6)
GROUP
COMPONENT ASSEMBLY
MAINTENANCE
MAINTENANCE LEVEL
TOOLS AND
NUMBER
FUNCTION
C
O
F
H
D
EQUIPMENT REMARKS
7203
Filter Element, Fluid
Inspect
0.17
Valve, Gate
Remove/
Replace
0.33
1, 4
Repair
0.17
4
Nozzle, Fuel and Oil
Remove/
Replace
0.17
Repair
0.67
4
Valve, Gate
Remove/
Replace
0.50
1, 4
Repair
1.50
Valve, Gate
Remove/
Replace
0.50
1, 4
Repair
1.50
Coupling Half, Quick
Remove/
Disconnect
Replace
0.17
1, 4
Repair
0.33
Valve Assembly, Manifold Remove/
Replace
0.50
1, 4
Repair
1.0
1, 4
Nozzle, Fuel and Oil
Remove/
Replace
0.33
4
Repair
0.50
4
Valve, Globe
Remove/
Replace
0.50
4
Repair
1.0
4
7204
Lever Assembly, Valve
Remove/
Replace
.28
1, 4
Cable
Remove/
Replace
3.18
1, 4
Cable
Remove/
Replace
3.18
1, 4
Bracket
Remove/
Replace
0.70
B-20
|