| |
TM 9-2330-398-24
Section II. MAINTENANCE ALLOCATION CHART
FOR SEMITRAILER, TANK: 5000 GALLON, M969A2 (continued)
(1)
(2)
(3)
(4)
(5)
(6)
GROUP
COMPONENT ASSEMBLY
MAINTENANCE
MAINTENANCE LEVEL
TOOLS AND
NUMBER
FUNCTION
C
O
F
H
D
EQUIPMENT REMARKS
7202
Pump, Centrifugal
Inspect
0.17
Remove/
Replace
1.52
3, 4,5
Repair
0.50
3, 4
Fault Location
0.33
1
Lubricate
0.50
1
Coupling, Pump
Test
0.17
1, 4
Remove/
Replace
5.35
1,4
Repair
11.03
1,4
7203
Valve, Butterfly
Remove/
Replace
1.0
1, 4
Repair
1.50
4
Tube Assembly, Metal
Inspect
0.07
Remove/
Replace
10.17
1,4
Tube
Remove/
Replace
9.27
1, 4
Tube, Bent, Metallic
Remove/
Replace
9.27
1, 4
Filter Element, Fluid
Remove/
Replace
9.27
1, 4
Valve, Globe
Remove/
Replace
.50
4
Repair
1.0
4
Frame
Remove/
Replace
3.62
1, 4
Repair
4.20
Valve, Check
Remove/
Replace
1.0
1, 4
Repair
1.50
1, 4
Tube, Bent, Metallic
Remove/
Replace
9.27
1, 4
B-18
|