| |
TM 9-2330-398-24
Section II. MAINTENANCE ALLOCATION CHART
FOR SEMITRAILER, TANK: 5000 GALLON, M969A2 (continued)
(1)
(2)
(3)
(4)
(5)
(6)
GROUP
COMPONENT ASSEMBLY
MAINTENANCE
MAINTENANCE LEVEL
TOOLS AND
NUMBER
FUNCTION
C
O
F
H
D
EQUIPMENT REMARKS
2952
Housing, Mechanical
Inspect
0.02
Remove/
Replace
5.68
1,4
Engine Shrouding
Remove/
Replace
6.43
1,4
2961
Alternator
Test
0.33
1,4
Adjust
0.17
1,4
Remove/
Replace
0.68
1, 3,4
Repair
1.02
3, 4
2963
Wiring Harness,
Remove/
Branched
Replace
0.68
4
Coupling, Tube
Remove/
Replace
0.77
4
Circuit Breaker
Remove/
Replace
0.43
4
Solenoid, Electrical
Remove/
Replace
0.35
4
Box, Electrical
Remove/
Replace
1.17
1, 4
Starter, Engine
Test
2.33
4
Remove/
Replace
2.02
4
Repair
2.35
4
Switch, Thermostatic
Test
1.83
Remove/
Replace
2.02
4
Fault Location
0.55
4
Solenoid, Electrical
Test
08
1
Adjust
1.83
Remove/
Replace
2.25
4
Repair
2.42
4
B-15
|