| |
TM 9-2330-398-24
Section II. MAINTENANCE ALLOCATION CHART
FOR SEMITRAILER, TANK: 5000 GALLON, M969A2 (continued)
(1)
(2)
(3)
(4)
(5)
(6)
GROUP
COMPONENT ASSEMBLY
MAINTENANCE
MAINTENANCE LEVEL
TOOLS AND
NUMBER
FUNCTION
C
O
F
H
D
EQUIPMENT REMARKS
1311
Hub, Wheel, Vehicular
Inspect
1.0
1, 4
Brake Drum
Remove
Replace
2.75
1, 4
Repair
2.94
Cone and Rollers
Lubricate
2.5
1, 4
15
FRAME, TOWING
ATTACHMENTS,
DRAWBARS, AND
ARTICULATION SYSTEM
1503
Coupler Assembly
Inspect
0.3
0.8
1, 4
Removal
Replace
.85
1, 4
Lubricate
0.30
1507
Stay, Sliding
Remove/
Replace
0.17
1, 4
Leg, Semitrailer
Inspect
0.7
0.08
Remove/
Replace
3.18
1, 4
Repair
3.43
1, 4
Fault Location
0.08
0.58
1, 4
Shaft, Straight
Remove/
Replace
0.50
1, 4
Crank, Hand
Lubricate
0.08
1, 4
Shoe, Jack Support
Lubricate
0.08
1, 4
Remove/
Replace
0.33
4
16
SPRING AND SHOCK
ABSORBERS
1601
Spring Assembly, Leaf
Inspect
0.01
0.01
Remove/
Replace
10.40
1, 4
B-9
|