| |
TM 9-2330-398-24
Section II. MAINTENANCE ALLOCATION CHART
FOR SEMITRAILER, TANK: 5000 GALLON, M969A2 (continued)
(1)
(2)
(3)
(4)
(5)
(6)
GROUP
COMPONENT ASSEMBLY
MAINTENANCE
MAINTENANCE LEVEL
TOOLS AND
NUMBER
FUNCTION
C
O
F
H
D
EQUIPMENT REMARKS
0613
Lead Assembly
Remove/
Replace
1.85
1, 4
Repair
2.0
1, 4
Wiring Harness
Remove/
Replace
1.85
1, 4
Repair
2.33
1, 4
Bend, Electrical
Remove/
Replace
5.18
1, 4
11
REAR AXLE
1100
Rear Axle Assembly
Inspect
0.08
0.08
Axle Assembly, Rear
Remove/
Replace
3.18
1, 4
Camshaft, Actuating
Remove/
Replace
3.58
1, 4
Bracket, Brake Cam
Lubricate
0.01
1, 4
Tube Assembly, Cross
Remove/
Replace
4.44
1, 4
Repair
5.98
Seat, Spring, Axle
Inspect
0.01
0.02
Remove/
Replace
3.18
1, 4
Lubricate
0.10
12
BRAKES
1202
Brake Shoe
Inspect
0.50
1, 4
Adjust
1.33
1, 4
Remove/
Replace
6.42
1, 4
Repair
5.27
1, 4
Pin, Grooved, Headles
Lubricate
0.01
1, 4
B-7
|