| |
TM 9-2330-398-24
Table 2-1. Unit Preventive Maintenance Checks and Services (PMCS) FOR THE M969A2 (continued)
Item
Item to
Not Fully Mission
No.
Interval
Check/ Service
Procedure
Capable If:
10
Annual
Wheels
a. Check for cracked wheels or hubs and
Three or more wheel stud
and Hubs
missing or loose wheel stud nuts. Repair or
nuts missing or loose.
replace as required.
b. Disassemble hub and drum assembly
(para 2-63). Clean and repack wheel bearings
(Appendix G).
11
Every
Engine
a. Check governor linkage for loose or missing
100
hardware.
Hours
2-12
|